The installation of multi disk screw press is a relatively complex process that requires following certain steps and precautions. The following is an overview of the installation steps based on search results:
Preparation before installation: Firstly, it is necessary to clean the installation position of the equipment and measure the horizontal height difference of the embedded steel plate with a level to ensure that it does not exceed 2mm. If there is a height difference, a steel plate needs to be prepared as a cushion plate for installation.
Lifting and adjustment: When lifting equipment, use synthetic fiber lifting ropes to hang the lifting ears, slowly pull up the equipment and align it with the installation position. Adjust the installation position in the lifting state to ensure that the horizontal error of the equipment host does not exceed 1mm. After the equipment is accurately positioned, fix the rack with chemical anchor bolts or anchor bolts.
Connection and fixation: Carefully read the instructions, connect the hoses, valves, and other components together according to the instructions, place the equipment in a reasonable position between the devices, and fix it on the ground.
Debugging: After the equipment is installed and the pipe fittings are connected, conduct a small experiment to observe flocculation and adjust the appropriate ratio of sludge to chemicals. After the device is powered on, perform an idle operation check for any abnormalities, which takes about two to three hours.
Operation and training: Start the equipment to start feeding sludge, gradually try the ratio of chemicals and sludge volume, and observe the flocculation effect. After debugging is completed, learn the equipment operation process with the installation personnel, conduct one-on-one training, and master the equipment operation process and usage skills.
Technical parameters and components: The multi disk screw press consists of a filter body formed by a fixed ring, a movable ring, and a screw shaft, a coagulation mixing tank, a cleaning spray device, a device that drives the screw shaft, and a back pressure plate that adjusts the moisture content of the cement cake.
Attention: During the installation process, it is necessary to strictly follow the requirements of the drawings and instructions to ensure the normal operation and safety of the equipment. At the same time, safety should be taken into account during the installation process to avoid accidents.
Please ensure to follow the detailed guidance and safety recommendations provided by the manufacturer during the installation process. If you have any questions or need professional assistance, it is recommended to contact the manufacturer or professional technicians for guidance.